Step 01
COMPLETEDSoil Analysis & Testing
2026-01-29 02:12:33.284Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-63B8
Inspector: INSP-GE-004 · Actor: Regional Agro Lab
Resolving locale, route permissions, and workspace projection.
Preparing bid history, traceability, and linked contracts.
Operational timeline with inspector captures, documentation numbers, certified materials, CO2 profile, and planned milestones.
Auction AUC-GE-2026-00010-02UV
Product cucumber
Region GE-TB
Tracking Code TRK-AUC-GE-2026-00010-02UV
Step 01
COMPLETED2026-01-29 02:12:33.284Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-63B8
Inspector: INSP-GE-004 · Actor: Regional Agro Lab
Step 02
COMPLETED2026-02-01 01:12:33.284Z
Mechanical deep tillage completed for root aeration and drainage.
Documentation No: DOC-TRC-2026-02-6AB0
Inspector: INSP-GE-007 · Actor: Farm Operations Crew
Step 03
COMPLETED2026-02-19 00:12:33.284Z
Protection cycle performed under residue and PHI constraints.
Documentation No: DOC-TRC-2026-03-61B7
Inspector: INSP-GE-004 · Actor: Agro Protection Team
Step 04
COMPLETED2026-02-21 19:12:33.284Z
NPK schedule executed and drip flow setpoints verified.
Step 06
COMPLETED2026-03-24 17:12:33.284Z
Brix, firmness and residue sampling signed by inspector.
Documentation No: DOC-TRC-2026-06-65BD
Inspector: INSP-GE-004 · Actor: ISO 17020 Inspector
Step 07
COMPLETED2026-03-26 10:12:33.284Z
Morning harvest and class grading recorded in batch book.
Step 09
PLANNED2026-03-29 11:12:33.284Z
Batch packed with QR traceability and retail label sequence.
Documentation No: DOC-TRC-2026-09-69B3
Inspector: INSP-GE-004 · Actor: Packing Facility QA
Step 10
PLANNED2026-03-30 15:12:33.284Z
Reefer dispatch started with telematics and temperature logger.
Documentation No: DOC-TRC-2026-04-67BE
Inspector: INSP-GE-001 · Actor: Irrigation Operator
Step 05
COMPLETED2026-02-26 10:12:33.284Z
Pollination support cycle completed for fruit set consistency.
Documentation No: DOC-TRC-2026-05-6EB6
Inspector: INSP-GE-001 · Actor: Field Biology Unit
Documentation No: DOC-TRC-2026-07-6CB4
Inspector: INSP-GE-001 · Actor: Harvest Team
Step 08
COMPLETED2026-03-27 15:12:33.284Z
Outbound residue and microbiology verification completed.
Documentation No: DOC-TRC-2026-08-63BC
Inspector: INSP-GE-001 · Actor: Accredited Laboratory
Documentation No: DOC-TRC-2026-10-60CA
Inspector: INSP-GE-007 · Actor: Cold-Chain Operator
Step 11
PLANNED2026-03-31 15:12:33.284Z
Delivery intake and shelf placement confirmation pending/complete.
Documentation No: DOC-TRC-2026-11-67C2
Inspector: INSP-GE-001 · Actor: Distribution Gate