Step 01
COMPLETEDSoil Analysis & Testing
2026-01-29 02:18:04.929Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-BC2C
Inspector: INSP-GE-007 · Actor: Regional Agro Lab
Resolving locale, route permissions, and workspace projection.
Preparing bid history, traceability, and linked contracts.
Operational timeline with inspector captures, documentation numbers, certified materials, CO2 profile, and planned milestones.
Auction AUC-GE-2026-00004-02IV
Product cucumber
Region GE-TB
Tracking Code TRK-AUC-GE-2026-00004-02IV
Step 01
COMPLETED2026-01-29 02:18:04.929Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-BC2C
Inspector: INSP-GE-007 · Actor: Regional Agro Lab
Step 02
COMPLETED2026-02-01 01:18:04.929Z
Mechanical deep tillage completed for root aeration and drainage.
Documentation No: DOC-TRC-2026-02-B333
Inspector: INSP-GE-001 · Actor: Farm Operations Crew
Step 03
COMPLETED2026-02-19 00:18:04.929Z
Protection cycle performed under residue and PHI constraints.
Documentation No: DOC-TRC-2026-03-BA3A
Inspector: INSP-GE-001 · Actor: Agro Protection Team
Step 04
COMPLETED2026-02-21 19:18:04.929Z
NPK schedule executed and drip flow setpoints verified.
Step 06
COMPLETED2026-03-24 17:18:04.929Z
Brix, firmness and residue sampling signed by inspector.
Documentation No: DOC-TRC-2026-06-BE30
Inspector: INSP-GE-007 · Actor: ISO 17020 Inspector
Step 07
COMPLETED2026-03-26 10:18:04.929Z
Morning harvest and class grading recorded in batch book.
Step 09
PLANNED2026-03-29 11:18:04.929Z
Batch packed with QR traceability and retail label sequence.
Documentation No: DOC-TRC-2026-09-B236
Inspector: INSP-GE-004 · Actor: Packing Facility QA
Step 10
PLANNED2026-03-30 15:18:04.929Z
Reefer dispatch started with telematics and temperature logger.
Documentation No: DOC-TRC-2026-04-B032
Inspector: INSP-GE-001 · Actor: Irrigation Operator
Step 05
COMPLETED2026-02-26 10:18:04.929Z
Pollination support cycle completed for fruit set consistency.
Documentation No: DOC-TRC-2026-05-B739
Inspector: INSP-GE-004 · Actor: Field Biology Unit
Documentation No: DOC-TRC-2026-07-B538
Inspector: INSP-GE-007 · Actor: Harvest Team
Step 08
COMPLETED2026-03-27 15:18:04.929Z
Outbound residue and microbiology verification completed.
Documentation No: DOC-TRC-2026-08-BC3F
Inspector: INSP-GE-004 · Actor: Accredited Laboratory
Documentation No: DOC-TRC-2026-10-B93E
Inspector: INSP-GE-001 · Actor: Cold-Chain Operator
Step 11
PLANNED2026-03-31 15:18:04.929Z
Delivery intake and shelf placement confirmation pending/complete.
Documentation No: DOC-TRC-2026-11-B035
Inspector: INSP-GE-001 · Actor: Distribution Gate