Step 01
COMPLETEDSoil Analysis & Testing
2026-01-30 04:11:54.220Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-E73E
Inspector: INSP-GE-007 · Actor: Regional Agro Lab
Resolving locale, route permissions, and workspace projection.
Preparing bid history, traceability, and linked contracts.
Operational timeline with inspector captures, documentation numbers, certified materials, CO2 profile, and planned milestones.
Auction AUC-GE-2026-00002-02DA
Product strawberry
Region GE-IM
Tracking Code TRK-AUC-GE-2026-00002-02DA
Step 01
COMPLETED2026-01-30 04:11:54.220Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-E73E
Inspector: INSP-GE-007 · Actor: Regional Agro Lab
Step 02
COMPLETED2026-02-02 03:11:54.220Z
Mechanical deep tillage completed for root aeration and drainage.
Documentation No: DOC-TRC-2026-02-EE35
Inspector: INSP-GE-007 · Actor: Farm Operations Crew
Step 03
COMPLETED2026-02-20 02:11:54.220Z
Protection cycle performed under residue and PHI constraints.
Documentation No: DOC-TRC-2026-03-E53D
Inspector: INSP-GE-001 · Actor: Agro Protection Team
Step 04
COMPLETED2026-02-22 21:11:54.220Z
NPK schedule executed and drip flow setpoints verified.
Step 06
COMPLETED2026-03-25 19:11:54.220Z
Brix, firmness and residue sampling signed by inspector.
Documentation No: DOC-TRC-2026-06-E933
Inspector: INSP-GE-001 · Actor: ISO 17020 Inspector
Step 07
COMPLETED2026-03-27 12:11:54.220Z
Morning harvest and class grading recorded in batch book.
Step 09
COMPLETED2026-03-30 16:11:54.220Z
Batch packed with QR traceability and retail label sequence.
Documentation No: DOC-TRC-2026-09-ED39
Inspector: INSP-GE-004 · Actor: Packing Facility QA
Step 10
COMPLETED2026-03-31 21:11:54.220Z
Reefer dispatch started with telematics and temperature logger.
Documentation No: DOC-TRC-2026-04-EB34
Inspector: INSP-GE-004 · Actor: Irrigation Operator
Step 05
COMPLETED2026-02-27 12:11:54.220Z
Pollination support cycle completed for fruit set consistency.
Documentation No: DOC-TRC-2026-05-E23B
Inspector: INSP-GE-007 · Actor: Field Biology Unit
Documentation No: DOC-TRC-2026-07-E03A
Inspector: INSP-GE-004 · Actor: Harvest Team
Step 08
COMPLETED2026-03-28 17:11:54.220Z
Outbound residue and microbiology verification completed.
Documentation No: DOC-TRC-2026-08-E731
Inspector: INSP-GE-001 · Actor: Accredited Laboratory
Documentation No: DOC-TRC-2026-10-E440
Inspector: INSP-GE-007 · Actor: Cold-Chain Operator
Step 11
PLANNED2026-04-01 17:11:54.220Z
Delivery intake and shelf placement confirmation pending/complete.
Documentation No: DOC-TRC-2026-11-EB47
Inspector: INSP-GE-001 · Actor: Distribution Gate