Step 01
COMPLETEDSoil Analysis & Testing
2026-01-31 02:18:40.410Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-7BFC
Inspector: INSP-GE-004 · Actor: Regional Agro Lab
Resolving locale, route permissions, and workspace projection.
Preparing bid history, traceability, and linked contracts.
Operational timeline with inspector captures, documentation numbers, certified materials, CO2 profile, and planned milestones.
Auction AUC-GE-2026-00001-01WJ
Product cucumber
Region GE-TB
Tracking Code TRK-AUC-GE-2026-00001-01WJ
Step 01
COMPLETED2026-01-31 02:18:40.410Z
pH, nutrient and microbiology baseline captured before planting.
Documentation No: DOC-TRC-2026-01-7BFC
Inspector: INSP-GE-004 · Actor: Regional Agro Lab
Step 02
COMPLETED2026-02-03 01:18:40.410Z
Mechanical deep tillage completed for root aeration and drainage.
Documentation No: DOC-TRC-2026-02-72F3
Inspector: INSP-GE-001 · Actor: Farm Operations Crew
Step 03
COMPLETED2026-02-21 00:18:40.410Z
Protection cycle performed under residue and PHI constraints.
Documentation No: DOC-TRC-2026-03-79FA
Inspector: INSP-GE-007 · Actor: Agro Protection Team
Step 04
COMPLETED2026-02-23 19:18:40.410Z
NPK schedule executed and drip flow setpoints verified.
Step 06
COMPLETED2026-03-26 17:18:40.410Z
Brix, firmness and residue sampling signed by inspector.
Documentation No: DOC-TRC-2026-06-7D00
Inspector: INSP-GE-001 · Actor: ISO 17020 Inspector
Step 07
COMPLETED2026-03-28 10:18:40.410Z
Morning harvest and class grading recorded in batch book.
Step 09
PLANNED2026-03-31 11:18:40.410Z
Batch packed with QR traceability and retail label sequence.
Documentation No: DOC-TRC-2026-09-7106
Inspector: INSP-GE-004 · Actor: Packing Facility QA
Step 10
PLANNED2026-04-01 15:18:40.410Z
Reefer dispatch started with telematics and temperature logger.
Documentation No: DOC-TRC-2026-04-7FF2
Inspector: INSP-GE-001 · Actor: Irrigation Operator
Step 05
COMPLETED2026-02-28 10:18:40.410Z
Pollination support cycle completed for fruit set consistency.
Documentation No: DOC-TRC-2026-05-76F9
Inspector: INSP-GE-007 · Actor: Field Biology Unit
Documentation No: DOC-TRC-2026-07-7408
Inspector: INSP-GE-004 · Actor: Harvest Team
Step 08
COMPLETED2026-03-29 15:18:40.410Z
Outbound residue and microbiology verification completed.
Documentation No: DOC-TRC-2026-08-7B0F
Inspector: INSP-GE-007 · Actor: Accredited Laboratory
Documentation No: DOC-TRC-2026-10-780E
Inspector: INSP-GE-004 · Actor: Cold-Chain Operator
Step 11
PLANNED2026-04-02 15:18:40.410Z
Delivery intake and shelf placement confirmation pending/complete.
Documentation No: DOC-TRC-2026-11-7F05
Inspector: INSP-GE-004 · Actor: Distribution Gate